I survived the Great Buffet Refinishing Job
Since I can't leave you hanging, I came back to post pictures. I finally finished the buffet, but I can't completely put it back together yet. My husband went out of town on business, and the screws for the mirror part are in the cupholder of his truck. We totally know what we're doing. (nope)
But here you go!
Post-sanding. It required 1,493 pieces of sandpaper, 1 detail sander and 583 detail sander sanding pads, and 1 belt sander and 8 sanding belts.
Sorry about this blurry picture of the stain job (before polyurethane), but I was tired y'all.
I didn't really know what tiger oak wood was until I saw this:
The finished product post-polyurethane (but still disassembled):
I am a professional, y'all.
But here you go!
Post-sanding. It required 1,493 pieces of sandpaper, 1 detail sander and 583 detail sander sanding pads, and 1 belt sander and 8 sanding belts.
Sorry about this blurry picture of the stain job (before polyurethane), but I was tired y'all.
I didn't really know what tiger oak wood was until I saw this:
The finished product post-polyurethane (but still disassembled):
And just for fun, here's my shirt:
It's beautiful! I'm wildly impressed!!!
ReplyDeleteOh my gosh! I love tiger wood! (who knew??)
ReplyDelete